THE BRIEF
![Combined Sound Insulation & Air Pressure Testing at St Josephs Care Home in Manchester Combined Sound Insulation & Air Pressure Testing at St Josephs Care Home in Manchester](https://www.ukbuildingcompliance.co.uk/wp-content/uploads/2021/06/St-Josephs-final.jpg)
THE PROCESS
THE RESULTS
≤ 3.0
Flat 52 Target
≤ 3.0
Flat 53 Target
2.82
Flat 52 Result
2.96
Flat 53 Result
PASS
PASS
Airborne Floor Target
Airborne Floor Result
≥ 45
Flat 49 Lounge/Kitchen - Flat 25 Bedroom
Airborne Wall Target
≥ 45
Flat 49 Lounge/Kitchen - Flat 25 Bedroom
Impact Floor Target
≤ 62
Flat 49 Lounge/Kitchen - Flat 50 Bedroom
50
Flat 49 Lounge/Kitchen - Flat 25 Bedroom
Airborne Wall Result
51
Flat 49 Lounge/Kitchen - Flat 25 Bedroom
Impact Floor Result
58
Flat 49 Lounge/Kitchen - Flat 50 Bedroom
PASS
PASS
PASS