SAP Report, Air Pressure, Sound Insulation & Ventilation Testing in Coventry

THE BRIEF

THE PROCESS

  • Further to reviewing drawings, on site testing was ready to be completed. our strict Air Tightness Testing procedures were adhered to, all calibrated equipment was setup to ensure the most accurate result possible was achieved
  • Sound Insulation Testing was carried out following Part E of the Building Regulations
  • Ventilation Testing was conducted following Part F of the Building Regulations
  • We offered assistance to the client during this project providing help and recommendations to pass their SAP Report  

THE RESULTs

  • AIR TESTING RESULTS

≤ 5.00 m³.h.m² @ 50pa

Target

  • SOUND TESTING RESULTS

Airborne Wall Target

 ≥ 45

56 Living Room 1 - 56a Living Room 1



Airborne Wall Target

 ≥ 45

56 Bedroom 1 - 56a Bedroom 1

  • SAP CALCULATION RESULTS

≤ 23.91

Target Emission Rate (TER)

≤ 68.50

Target Fabric Energy Efficiency (TFEE)

3.15

Result


52

Result



53

Result




23.10

Dwelling Emission Rate (DER)

60.70

Dwelling Fabric Energy Efficiency (DFEE)

PASS


PASS



PASS


PASS

PASS

  • Compliant
  • The DER/DFEE achieved well below the requirement in order to meet the TER/TFEE
  • All the Ventilation Tests were performed with all Ventilation passing
  • Furthermore, our Combined Certification & Testing package offers excellent value   

Please refer to our Myth Busters for SAP Calculations here, Myth Busters for Air Tightness Testing here for common misconceptions and our How To Guides in our Advice Centre here

Start Using UK Building Compliance Today


You may also like

May 7, 2024

May 7, 2024

May 7, 2024

May 7, 2024

May 7, 2024

January 25, 2024

Start Using UK Building Compliance Today