Residential Air Tightness Testing in Chesterfield

THE BRIEF

Residential Air Tightness Testing in Chesterfield

THE PROCESS

  • After reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance to our strict procedures to ensure the most accurate result possible

THE RESULTs

  • AIR TESTING RESULTS

≤ 5.00 m³.h.m² @ 50pa

Plot 2 - Target

≤ 5.00 m³.h.m² @ 50pa

Plot 4 - Target

4.86

Plot 2 - Result

4.48

Plot 4 - Result

PASS

PASS

  • Compliant