New Build Air Testing Kidderminster

THE BRIEF

New Build Air Testing Kidderminster

THE PROCESS

  • After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible

THE RESULTs

  • AIR TESTING RESULTS

≤ 5.0 m³.h.m² @ 50pa

Target

4.9

Result

PASS

  • Compliant
  • All of the Ventilation Tests passed with no problems