UK Building Compliance are proud to offer our services to the local community, although we also operate on a Nationwide scale and frequently carry out work all over the UK
THE PROCESS
After reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance to our strict procedures to ensure the most accurate result possible
THE RESULTs
AIR TESTING RESULTS
≤ 4.5 m³.h.m² @ 50pa
Target
VENTILATION TESTING RESULTS
≥ 30
Target - Kitchen
≥ 8
Target - Bathroom
4.43
Result
34.60
Result - Kitchen
8.43
Result - Bathroom
PASS
PASS
PASS
Compliant
Both the Air Pressure and Ventilation Tests passed with no problems
Our Combined Testing package offers excellent value