Recent Projects

THE BRIEFUK Building Compliance conducted Complete Building Compliance for this large 6 bed, 3 floor property in Surrey – we completed SAP Calculations & Water Efficiency Calculations and Air Tightness & Ventilation TestingTHE PROCESSThe initial Air Tests carried out were problematic – we carried out some diagnostics with the customer and located the root of the problem

Read More
SAP Calculation & Air Testing – Surrey

Recent Projects

THE BRIEFAlderman’s Estates, a prestigious property developer asked us to carry out a combination of Air Tightness Testing and Sound Insulation Testing on a series of high end luxury residences at Wavendon Manor, Cross End, Milton Keynes in BuckinghamshireOn this project, each residence had an Air Pressure Testing Target ≤ 5 m³.h.m² @ 50paThe Sound

Read More
High End Luxury Residences – Combined Testing – Wavendon Manor, Milton Keynes, Buckinghamshire

Recent Projects

THE BRIEFWe were instructed to carry out L1A SAP Calculations on this block of flats in CroydonThe Planning Condition required a 19% DER (Dwelling Emissions Rate) Reduction on top of baseline Part L Standards THE PROCESSUKBC assisted with the specification of the Glazing, U-Values, Insulation, Heating Systems and Thermal BridgingCreative solutions were required in order

Read More
Planning Condition: 19% Reduction – SAP Calculations, Croydon

Recent Projects

THE BRIEFWe were instructed to carry out a Commercial Air Pressure Test on a large office space for a plastic manufacturing company at Carrington Business Park in ManchesterThe required target for this site was ≤ 5 m³.h.m² @ 50paTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup

Read More
Commercial Air Tightness Test – Carrington Business Park, Manchester

Recent Projects

THE BRIEFUK Building Compliance provided a Complete Package for this client – we assisted from the Planning Stage (Regulation 25A) to the Design (SAP Calculations & Water Efficiency Calculations), right through to Completion (Air Pressure Testing & Ventilation Testing)THE PROCESSWe completed a Regulation 25A Report in order to assess the feasibility of various renewable technologies

Read More
Complete Package – Planning (Regulation 25A), Design (SAP/Water) & Completion (Air/Vent)