THE BRIEFWe were instructed to complete Air Tightness Testing on this residential property in PattinghamTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance to our strict procedures to ensure the most accurate result possibleTHE RESULT≤ 6 m³.h.m² @ 50pa3.01PASSCompliantThe property scored extremely low which demonstrates an
Recent Projects