Recent Projects

UK Building Compliance completed Validation Testing for Acoustic Design, Ventilation Testing for MVHR (Mechanical Ventilation with Heat Recovery) and Sound Insulation Testing for this Block of Flats.The Validation Testing was conducted to validate that the Acoustic Design standards which were set had been met upon the completion of the project.On this particular project an Environmental Noise

Read More
Validation Testing of Acoustic Design

Recent Projects

THE BRIEFWe were instructed to complete a combination of L1B SAP Calculations, Sound Insulation Testing and Water Efficiency Calculations on this proposed conversion of an existing commercial space into two domestic flatsThe Sound Insulation Tests consisted of Airborne Floor, Airborne Wall and Impact Floor Tests To pass this Airborne test, you must score 45db or higherAirborne tests

Read More
L1B SAP Calculations & Sound Testing – Kent

Recent Projects

THE BRIEFWe were instructed by a Property Management company to conduct Sound Insulation Testing at a set of flats above The Green Man Pub in Harlesden, LondonThe Sound Insulation Tests consisted of Airborne Floor, Airborne Wall and Impact Floor Tests To pass these Airborne test, you must score 43db or higherAirborne tests measure the difference in sound

Read More
Sound Testing – Green Man Pub, Harlesden

Recent Projects

THE BRIEFUK Building Compliance conducted Combined Testing, the tests consisted of Sound Insulation Testing and Ventilation Testing for a property in Leicester. We also carried out Water Efficiency Calculations for this property.The Sound Tests were Airborne Wall testsTo pass an Airborne test for new build properties you must score 45db or higher Airborne tests measure the difference in sound levels between

Read More
Sound Insulation Testing & Ventilation Testing

Recent Projects

THE BRIEFUKBC completed an Energy Statement, SAP Calculations & Water Efficiency Calculations at this set of dwellings in MaidenheadThe Energy Statement had to meet a 20% carbon reduction on top of Part L StandardsTHE PROCESSThe Energy Statement Targets were met via:Low U-ValuesLow Air Permeability3.1kWP Solar PV System THE RESULTsSAP ASSESSMENT RESULTS≤ 15.03Right Plot Target Emission

Read More
Energy Statement & SAP – Maidenhead