Recent Projects

THE BRIEFUK Building Compliance completed an L1B Extension Calculation on this proposed extension in ColwichTo achieve compliance, the proposed extension must improve the performance of the dwellingTHE PROCESSExceeding targets in energy and fabric efficiency required our STROMA accredited consultants to advise the following:  Specifying a low U-Value in all proposed and upgraded elements of the propertyRecommending the

Read More
Extension Calculations – Colwich

Recent Projects

THE BRIEFUK Building Compliance can offer a Complete Package and guidance for all your Building Testing and Calculation requirements – this is a recent project we completed in StockportThe Building Testing consisted of Air Tightness Testing, Sound Insulation Testing and Ventilation Testing and the Building Certification included L1A SAP Calculations and Water Efficiency CalculationsWe are accredited by three different institutions

Read More
Stockport Building Testing & Calculations

Recent Projects

THE BRIEFA construction company asked UKBC to complete Air Tightness Testing on a series of New Build houses in RugbyAir leakage can cause you to lose up to 30% of a dwelling’s heat, making the building less energy efficient and more expensive to run. Therefore, making sure your property meets an acceptable air tightness standard reduces

Read More
New Build Air Testing

Recent Projects

THE BRIEFUK Building Compliance completed a Sustainability Statement at this redevelopment in Blackrod, Bolton          The Statement was required in order to meet Bolton Council’s local policies as well as the projects planning conditionsTHE PROCESSOur assessors outlined the following to meet the sustainability requirements:Carbon Reduction StrategyWaste Management StrategySustainable Construction StrategyEcological AppraisalEco Homes Pre-AssessmentTHE

Read More
Sustainability Statement – Bolton

Recent Projects

THE BRIEFUK Building Compliance completed SAP Reports on two new build plots in DorsetThese were L1A Design Calculations, which include a Predicted EPC RatingWe recommend you commission your SAP calculations for new builds at design stage because if your building is struggling to meet requirements, our team can advise you on how to improveOur STROMA Accredited Consultants

Read More
Dorset SAP Reports