Recent Projects

THE BRIEFUK Building Compliance conducted Air Tightness Testing at this new build property in KentWe also completed SAP Calculation certification To read more about New Build Air Testing, please see our page here STROMA accredited consultants carry out our Building Certification, for this client it was L1A SAP Calculations for New Builds THE PROCESSAfter reviewing drawings, on site testing was

Read More
Air Pressure Test in Kent (plus SAP)

How To

Passing A Ventilation Test First Time Ventilation Tests are performed to ensure that extractor fans throughout a building have appropriate flow rates according to Part F of the Building Regulations.Ventilation is an important component in buildings, it ensures air quality is of a good standard; removing moisture, odours, gases, dust and other air pollutants from the

Read More
How To Pass A Ventilation Test

Recent Projects

THE BRIEFUK Building Compliance recently conducted Air Pressure Testing at a New Build propertyTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible THE RESULTsAIR TESTING RESULTS≤ 10.0 m³.h.m² @ 50paTarget3.45ResultPASSCompliantThe plot achieved

Read More
Air Pressure Testing – New Build

Recent Projects

THE BRIEFUK Building Compliance completed an L1B SAP Calculation on this barn conversion in GloucestershireOur STROMA certified consultants can discuss the requirements to help you meet all the Building Regulation StandardsTHE PROCESSFabric efficiency targets were met through low u-values of all external walls, floors and roofsLow glazing U-values also helped to achieve fabric efficiency targetsEmissions targets

Read More
Barn Conversion SAP in Gloucestershire

Recent Projects

THE BRIEFUKBC were appointed to undertake L1B SAP Calculations and an Energy Statement on a 400 plot development in Kent The Energy Statement was required in order to meet Ashford Council’s local policiesTHE PROCESSOur assessors outlined the following to meet the project’s requirements:Low U-Values and low Air PermeabilityMechanical Ventilation Heat Recovery (MVHR)Solar PV THE RESULTsAVERAGE SAP RESULTS≤

Read More
Energy Statement & SAP – Ashford