Recent Projects

THE BRIEFUK Building Compliance recently conducted an Air Pressure Test at a New Build property in BerkhamstedThis large domestic property was equipped with Mechanical Ventilation with Heat Recovery (MVHR), an air source heat pump and air conditioning Being accredited by ATTMA allows us to ensure that the quality of our work is the best in our industryTHE PROCESSAfter reviewing

Read More
Air Pressure Test Berkhamsted

Recent Projects

THE BRIEFUK Building Compliance conducted Air Tightness and Ventilation Testing and produced a SAP Report for this new buildThe property located in Thorpe Satchville Two Air Tests were performed due to the first failing. However, thanks to our team we were able to identify and fix issues so the second test resulted in a passTHE PROCESSAfter reviewing drawings,

Read More
Air Pressure & Ventilation Testing + SAPs

Recent Projects

THE BRIEFUK Building Compliance conducted Air Tightness Testing at this new build property in KentWe also completed SAP Calculation certification To read more about New Build Air Testing, please see our page here STROMA accredited consultants carry out our Building Certification, for this client it was L1A SAP Calculations for New Builds THE PROCESSAfter reviewing drawings, on site testing was

Read More
Air Pressure Test in Kent (plus SAP)

How To

Passing A Ventilation Test First Time Ventilation Tests are performed to ensure that extractor fans throughout a building have appropriate flow rates according to Part F of the Building Regulations.Ventilation is an important component in buildings, it ensures air quality is of a good standard; removing moisture, odours, gases, dust and other air pollutants from the

Read More
How To Pass A Ventilation Test

Recent Projects

THE BRIEFUK Building Compliance recently conducted Air Pressure Testing at a New Build propertyTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible THE RESULTsAIR TESTING RESULTS≤ 10.0 m³.h.m² @ 50paTarget3.45ResultPASSCompliantThe plot achieved

Read More
Air Pressure Testing – New Build