Recent Projects

THE BRIEFUK Building Compliance carried out SAP Calculations at a set of properties in Glasgow, Scotland in order to satisfy Section 6 of the Building RegulationsTHE PROCESSCompliance was achieved via:6.75kWp Solar PV systemVery Low U-ValuesLow Air PermeabilityA low Thermal Mass (thanks to a timber frame construction) THE RESULTsSITE WIDE SAP RESULTS≤ 26.46Average Target Emission Rate

Read More
Section 6 SAP Calculations – Glasgow, Scotland

Recent Projects

THE BRIEFUK Building Compliance completed an Air Pressure Test on this brilliant building  Our staff worked hard assisting the client to comply with Regulations This property is a fantastic example of one utilising renewable energy sources. On the property Solar Panels and two Air Source Heat Pumps can be found THE PROCESSAfter reviewing drawings testing was ready to

Read More
Air Pressure Test in Cheshire

Recent Projects

THE BRIEFUK Building Compliance conducted Air Pressure Testing on this flawless new build property  The house was located in Wood EndResults from the test met Building Regulation standards. This test passed scoring 2.80m³.h.m² @ 50pa below its targetTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance

Read More
Air Pressure Testing – New Build in Wood End

Recent Projects

THE BRIEFUK Building Compliance conducted Sound Insulation Testing for our client in ShrewsburyThe Sound Tests were Airborne Wall testsTo pass an Airborne test for conversion properties you must score 43db or higher Airborne tests measure the difference in sound levels between the receiver room and neighbouring walls or floorsIf the sound output in the receiver room is

Read More
Sound Insulation testing – Barn Conversion in Shrewsbury

Recent Projects

THE BRIEFUK Building Compliance conducted Commercial Air Pressure Testing at Wall Heath Evangelical Free Church in KingswinfordOur team on-site went above and beyond to help the client identify issues to have them properly repairedAir leakage can cause up to 30% loss of a building’s heat which makes it less energy efficient and more expensive to

Read More
Commercial Air Pressure Testing – Wall Heath Evangelical Free Church, Kingswinford