Recent Projects

THE BRIEFUK Building Compliance conducted Sound Insulation Testing for our client in ShrewsburyThe Sound Tests were Airborne Wall testsTo pass an Airborne test for conversion properties you must score 43db or higher Airborne tests measure the difference in sound levels between the receiver room and neighbouring walls or floorsIf the sound output in the receiver room is

Read More
Sound Insulation testing – Barn Conversion in Shrewsbury

Recent Projects

THE BRIEFUK Building Compliance conducted Commercial Air Pressure Testing at Wall Heath Evangelical Free Church in KingswinfordOur team on-site went above and beyond to help the client identify issues to have them properly repairedAir leakage can cause up to 30% loss of a building’s heat which makes it less energy efficient and more expensive to

Read More
Commercial Air Pressure Testing – Wall Heath Evangelical Free Church, Kingswinford

Recent Projects

THE BRIEFUK Building Compliance completed a combined package for this client Ventilation Testing, two Air Pressure Tests & SAP Reports were completed SAPs and Air Pressure Tests were conducted for the house and an annexTHE PROCESSAfter reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedures, all calibrated

Read More
SAP Report, Air Pressure & Ventilation Testing in Oadby

Recent Projects

THE BRIEFUK Building Compliance carried out a series of  Sound Testing and Air Testing for a property in Northampton Sound Testing for these properties were Airborne Wall tests and carried out by our SITMA accredited technicianTo pass an Airborne test for new build properties you must score 45db or higher Airborne tests measure the difference in sound levels

Read More
Sound Testing & Air Testing in Northampton

Recent Projects

THE BRIEFUK Building Compliance performed L1B Sap Calculations for an extension on a property in Sudbury THE PROCESSLow u-values of all proposed elements meant that compliance was metStandards were also met by installing an efficient heating system (air source heat pump) which utilises renewable energy  THE RESULTsSAP RESULTS≤ 21.37Notional Target Emission Rate (TER)≤ 37.06Notional Dwelling Emission

Read More
SAP Calculations – Extension in Sudbury