THE BRIEFUK Building Compliance completed an Air Pressure Test on this property THE PROCESSFurther to looking at the drawings, we tested this property in accordance with our strict air tightness testing proceduresAll calibrated equipment was setup to ensure the most accurate result possible was achieved THE RESULTsAIR TESTING RESULTS≤ 5.00 m³.h.m² @ 50paTarget4.86ResultPASSCompliantAir Tightness levels were in
Recent Projects