What information do you require to carry out a SAP calculation? This is one of the common questions we get here at UKBC. So, we have provided a comprehensive list below outlining the information that is required. Drawings:Building regulation drawings are required in order to be able to start the calculations.This includes:Floor plansSectionsElevationsSite PlanThese drawings help to
Checklist