After drawings were reviewed, our ATTMA registered engineer tested this property in accordance with strict air tightness testing procedures
All calibrated equipment was setup to ensure the most accurate result possible was achieved
Ventilation Testing was also carried out to ensure Part F Regulations were met
THE RESULTs
AIR TESTING RESULTS
≤ 8.00 m³.h.m² @ 50pa
Plot 18 Target
≤ 8.00 m³.h.m² @ 50pa
Plot 19 Target
3.94
Plot 18 Result
3.08
Plot 19 Result
PASS
PASS
Compliant
All Ventilation & Air Tightness Tests passed their targets