AIR TIGHTNESS TESTING & SAP CALCULATIONS

THE BRIEF

Air tightness testing

THE PROCESS

  • After drawings were reviewed, on site testing was ready to be completed in accordance with our strict air tightness testing, all calibrated equipment was setup to ensure the most accurate result possible.

THE RESULTs

lodge 1:


  • AIR TESTING RESULTS

≤ 8.00 m3.h.m2 @ 50pa

7.16

Result

  • SAP RATING

≤ 26.08

Average Target Emission Rate (TER)

23.57

Average Dwelling Emission Rate (DER)

PASS

PASS

PASS



THE RESULTs

lodge 2:

  • AIR TESTING RESULTS

≤ 8.00 m3.h.m2 @ 50pa

6.72

Result

  • SAP RATING

≤ 26.08

Average Target Emission Rate (TER)

23.3

Average Dwelling Emission Rate (DER)

PASS

PASS

PASS


  • Compliant
  • Air Tightness Tests passed the target - Please refer to our Myth Busters for SAP Calculations here, Myth Busters for Air Tightness Testing here for common misconceptions and our How To Guides in our Advice Centre here