UK Building Compliance recently conducted Air Pressure Testing at a New Build property
THE PROCESS
After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible
THE RESULTs
AIR TESTING RESULTS
≤ 10.0 m³.h.m² @ 50pa
Target
3.45
Result
PASS
Compliant
The plot achieved an extremely good score which shows that it has a very good level of Air Tightness
Please refer to our Myth Busters for Air Tightness Testing here for common misconceptions and our How To Guides in our Advice Centre here