Air Pressure Testing – New Build

THE BRIEF

Air Pressure Testing

THE PROCESS

  • After reviewing drawings, on site testing was ready to be completed. In accordance with our strict air tightness testing procedure, all calibrated equipment was setup to ensure the most accurate result possible

THE RESULTs

  • AIR TESTING RESULTS

≤ 10.0 m³.h.m² @ 50pa

Target

3.45

Result

PASS

  • Compliant
  • The plot achieved an extremely good score which shows that it has a very good level of Air Tightness

Please refer to our Myth Busters for Air Tightness Testing here for common misconceptions and our How To Guides in our Advice Centre here