After reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance to our strict procedures to ensure the most accurate result possible
THE RESULTs
AIR TESTING RESULTS
≤ 5.00 m³.h.m² @ 50pa
4.47
PASS
Compliant
Air Tightness levels were in accordance with Building Regulations