After drawings were reviewed, our ATTMA registered engineer tested this property in accordance with strict air tightness testing procedures
All calibrated equipment was setup to ensure the most accurate result possible was achieved
Ventilation Testing was also carried out to ensure Part F Regulations were met
THE RESULTs
AIR TESTING RESULTS
≤ 5.00 m³.h.m² @ 50pa
Target
4.43
Result
PASS
Compliant
All Ventilation & Air Tightness Tests passed their targets
Please refer to our Myth Busters for SAP Calculations here, Myth Busters for Air Tightness Testing here and for common misconceptions and How To Guides in our Advice Centre here