London Plan Energy Statement & SAP Calculations in London

THE BRIEF

THE PROCESS

  • Our Stroma accredited assessors achieved targets by outlining the following methods:-                                                                   An efficiency fabric that meets Part L requirements and an air Source heat pump was recommended

THE RESULTs

  • SAP CALCULATION RESULTS

≤ 16.60

Target Emission Rate (TER)

8.00

Dwelling Emission Rate (DER)

PASS

  • Compliant
  • The SAP results were low enough in order to meet the London Plan reduction requirements, as well as Part L standards
  • Efficient fabric combined with an efficienct heating system means that a C02 reduction of 50.92% was achieved
  • Furthermore, our Combined Certification & Testing package offers excellent value, as well as peace of mind throughout the entire process  

Please refer to our Myth Busters for SAP Calculations here & Myth Busters for Air Tightness Testing here. Also check out our How to Pass a Ventilation Test here and our How To Guides in our Advice Centre here

Start Using UK Building Compliance Today


You may also like

May 7, 2024

May 7, 2024

May 7, 2024

May 7, 2024

May 7, 2024

January 25, 2024

Start Using UK Building Compliance Today