Air Pressure Testing – Village Development

THE BRIEF

  • We were instructed to carry out a series of Air Pressure Tests on a unique development of 5 detached homes on a private road in the idyllic village of Stoke Golding
  • This work was instructed by a reputable construction company
Air Pressure Testing - Village Development

THE PROCESS

  • After reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance to our strict procedures to ensure the most accurate result possible

THE RESULT

≤ 6 m³.h.m² @ 50pa

Target - Plot 5

4.03

Result

PASS