THE BRIEF
- We were instructed to complete Ventilation Testing on an extension to this primary school in Acton
- A new toilet block had been built as an extension while the students were on their school holidays
- Only the new toilet extracts required testing, each with targets of 6 and above
THE PROCESS
- After reviewing drawings, on site testing was ready to be completed. All calibrated equipment was setup in accordance to our strict procedures to ensure the most accurate result possible
THE RESULT
- Compliant
- All of the tests passed with flying colours, meaning that their ducting was effective and their ventilation system powerful